Sunday, June 28, 2009

Brian's 2009 Climb

















Well, OK. He didn't climb Denali. But at least Brian got to wear his crampons once this year.

After about 3 days of prep work (grinding, then acid etching, then cleaning and drying), we painted the kitchen floor last night with a 2-part epoxy paint. When the first coat was down, Brian donned his crampons to walk over the floor sprinkling silica sand all around the traffic areas. This should help prevent the concrete floor from becoming slippery when wet. Today we will put on the second coat. Once it dries, we finally get to move all the equipment to permanent locations in the kitchen!

No comments:

Post a Comment